Oracle CPQ Cloud Service 2016 Implementation Specialist — Question 4
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.
Answer options
- A. There are no components attached to it.
- B. The Automatically Transact check box is deselected.
- C. The Automatically Transact check box is selected.
- D. The Count Point check is selected.
- E. The Count Point check box is deselected.
Correct answer: B, E
Explanation
The correct answer is B and E because for an Optional Operation, the Automatically Transact checkbox must be deselected (B) and the Count Point checkbox must also be deselected (E). Options A, C, and D do not fulfill the necessary conditions for classifying a Standard Operation as Optional.