PRINCE2 Agile Foundation — Question 9
What is an epic?
Answer options
- A. A low-level requirement
- B. A fine-grained user story
- C. A detailed feature
- D. A high-level requirement
Correct answer: D
Explanation
An epic is considered a high-level requirement because it encapsulates a substantial piece of work that can be broken down into smaller user stories or tasks. The other options describe elements that are more granular and specific, which do not capture the broad scope that an epic represents.