Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert — Question 132
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
Answer options
- A. Change the coverage group on the kit item to Manual.
- B. Select Phantom on the engineering fast tab on the kit item.
- C. Change the line type to Pegged supply.
- D. Change the line type to Phantom.
Correct answer: D
Explanation
The correct answer is D because changing the line type to Phantom allows the kit item to act as a placeholder in the BOM without generating a separate production order. Options A and C do not achieve the desired outcome of avoiding a distinct production order, and option B, while related, does not directly address the requirement of setting the line type.