A user wishes to perform the same work tasks on several assets simultaneously. How can this be configured?
Answer options
- A. A Route should be created with each stop being one Asset and the Job Plan associated with the Route record.
- B. A Master Job Plan should be created with Tasks for each Asset.
- C. A Work Order Hierarchy should be created against the same Job Plan used for all stops.
- D. The Assets should be specified on the Multiple Assets, Locations and CIs table on the Work Order.
Correct answer: A
Explanation
The correct answer is A, as creating a Route allows for organized execution of tasks across multiple assets by associating a Job Plan with each stop. Options B and C suggest creating plans or hierarchies that do not directly facilitate simultaneous task execution across multiple assets. Option D does not address the structured approach needed to manage tasks effectively across several assets.