CompTIA Network+ (N10-007) — Question 347

A flood disables the equipment in a company's server room. When implementing the disaster recovery plan, all operations are immediately transitioned to another location with momentary downtime. This is an example of a:

Answer options

Correct answer: D

Explanation

The correct answer is D, hot site, as it refers to a fully operational site that can take over operations with minimal downtime. A warm site (A) requires some setup time, while a cold site (B) is not equipped with the necessary infrastructure for immediate operations. A snapshot (C) is unrelated to site recovery and refers to a backup of data at a specific point in time.