VMware Cloud Director Specialist (2023) — Question 39
Which two prerequisites must be met before an NSX Edge cluster can be deployed through SDDC Manager in a VI Workload Domain? (Choose two.)
Answer options
- A. Host overlay and Edge overlay networks must be routable
- B. vMotion and Edge overlay networks must be routable
- C. The NSX Edge nodes must be configured through an LDAP provider
- D. SSH must be enabled on the NSX Edge nodes
- E. The FQDN of the NSX Edge nodes must be resolvable through DNS
Correct answer: A, E
Explanation
The correct answers, A and E, are essential for the NSX Edge cluster deployment; the routability of the overlay networks ensures proper communication, and DNS resolution of the FQDN allows for proper identification of the Edge nodes. Options B, C, and D are not prerequisites for the deployment of the NSX Edge cluster in this context.