VMware Cloud Director Specialist (2020) — Question 21
An administrator reviews all requirements in the environment before deploying a stretched cluster.
Which two requirements must be ready? (Choose two.)
Answer options
- A. VMware NSX Service Mesh
- B. vSAN Enterprise license
- C. VMware HCX
- D. NSX Advanced Load Balancer
- E. DHCP on overlay network in each site
Correct answer: B, E
Explanation
The correct answers, B and E, are essential because a vSAN Enterprise license is required to enable stretched cluster features, and DHCP on the overlay network is necessary for proper network configuration across sites. The other options, while relevant to VMware environments, are not mandatory for the deployment of a stretched cluster.