A solution architect has finished conducting interviews and gathering requirement for a company, and has determined that the logical requirements are:
✑ Two data centers for high availability
✑ Synchronous replication to meet the zero-minute PRO
✑ Separating management workloads from application workloads
✑ Dedicated 10Gb uplink for each low latency server
✑ Single management point for the entire environment
Which two actions would meet the design requirements? (Choose two.)
Answer options
- A. Create two data center objects in vCenter Server.
- B. Configure vSAN Stretched Clustering
- C. Configure SR-IOV for low latency servers
- D. Create one folder for Management workloads and one folder for application workloads
Correct answer: B, D
Explanation
Option B, configuring vSAN Stretched Clustering, meets the requirement for high availability and synchronous replication. Option D, creating separate folders for management and application workloads, supports the need to separate these workloads. Options A and C do not directly address the high availability and workload separation requirements.