VMware vSphere 6.5 Foundations (VCP6.5-DCV) — Question 79
Which two are true about the Risk badge in vRealize Operations? (Choose two.)
Answer options
- A. The Risk badge indicates potential future problems that may degrade the performance of the system.
- B. Risks may require attention in the near future.
- C. The Risk badge indicates problems that are degrading performance of the system.
- D. Risks require attention now to correct system performance problems.
Correct answer: A, B
Explanation
The correct answers, A and B, accurately describe the Risk badge as an indicator of potential future issues and that these risks may need timely attention. Options C and D misrepresent the Risk badge, as they suggest that it indicates current problems rather than future risks.