VMware Carbon Black Cloud Professional (2021) — Question 68

After a disaster recovery failure which left the data center unavailable, a company's Horizon Administration Team has decided to increase the capacity of their
Horizon desktop pools and their resiliency.
Which two deployment options would support the requirement? (Choose two.)

Answer options

Correct answer: C, D

Explanation

Options C and D are correct because deploying Horizon in a Remote Data Center or on VMware Cloud on AWS allows for enhanced resiliency and capacity by utilizing different physical locations or cloud infrastructure. Options A, B, and E do not provide the necessary separation or cloud capabilities that are needed to increase resiliency after a failure at the original data center.