SnowPro Core Certification — Question 1211

A size X-Small virtual warehouse ran for 90 seconds, and was shut down. The warehouse was then run for another 30 seconds before being shut down again.

How many seconds will be billed?

Answer options

Correct answer: C

Explanation

The total time billed is the sum of the two separate operations of the virtual warehouse. The first run lasted 90 seconds and the second run was for 30 seconds, which totals to 120 seconds. However, in this scenario, billing is often done in blocks, and it can accumulate to 150 seconds due to the specific billing policies in place.