Lean Six Sigma Green Belt (LSSGB) — Question 15
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
Answer options
- A. True
- B. False
Correct answer: A
Explanation
The correct answer is True because a periodic time frame helps in consistently applying statistical process control (SPC) methods, ensuring accurate Control Limit and Center Line calculations. The option False is incorrect as it contradicts the benefits of using a structured time frame in SPC.