IASSC Certified Lean Six Sigma Green Belt (ICGB) — Question 20

A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.

Answer options

Correct answer: A

Explanation

The correct answer is True because a periodic time frame allows for consistent data collection and analysis, which is essential for effective Statistical Process Control (SPC). The option False is incorrect as it implies that a time frame is not necessary for these calculations, which is not true in good SPC implementation.