Professional Scrum Master II (PSM II) — Question 60
A Scrum Team must have a Product Owner and Scrum Master.
Answer options
- A. False. A Scrum Master is only necessary when requested or needed.
- B. True. Each must be a full-time member on the Scrum Team.
- C. True. Their participation and availability will impact the outcomes produced by the Scrum Team.
- D. False. If a Product Owner is unavailable, he/she can be replaced by a Business Analyst.
Correct answer: C
Explanation
Option C is correct because the involvement and availability of both the Product Owner and Scrum Master significantly influence the outcomes of the Scrum Team. Options A and D are incorrect as they downplay the necessity of these roles, while B suggests that both must be full-time, which is not always required.