Professional Scrum Master II (PSM II) — Question 158

Which of the following are time-boxed events in Scrum?

Answer options

Correct answer: E

Explanation

The correct answer is E because all the listed events in Scrum are designed to be time-boxed, meaning they have a set duration. Options A, B, C, and D are all specific events within the Scrum framework that occur within predetermined time limits, making them collectively time-boxed events.