SAP Certified Application Associate – SAP S/4HANA Sourcing and Procurement – Upskilling (2021) — Question 15
What data does the system require to determine the safety stock during automatic reorder point planning? (Choose three.)
Answer options
- A. Replenishment lead time
- B. The storage costs code
- C. Service level
- D. Mean absolute deviation
- E. Minimum and maximum stock levels
Correct answer: A, D, E
Explanation
The correct answers are A, D, and E because replenishment lead time informs how long it takes to restock, mean absolute deviation measures variability in demand, and minimum and maximum stock levels define the range for safety stock. Options B and C, while relevant to inventory management, do not directly influence the calculation of safety stock in the context of reorder point planning.