SAP Certified Technology Associate – SAP HANA 2.0 (SPS05) — Question 5
Which prerequisites must be fulfilled before adding hosts to an SAP HANA scale-out system? (Choose two.)
Answer options
- A. The additional host is placed in a different data center.
- B. The SAP HANA database server is shut down
- C. The host has access to the installation directories.
- D. The SAP HANA system installation is on a shared file system.
Correct answer: A, C
Explanation
Answer A is correct because having the additional host in a different data center can affect the scale-out architecture. Answer C is also correct since access to installation directories is essential for the new host to integrate properly. Options B and D are incorrect; the SAP HANA database does not need to be shut down when adding hosts, and while a shared file system can be beneficial, it is not a strict prerequisite.