Oracle Database Administration 2019 Certified Professional — Question 22

You must deploy several Oracle 19c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.
Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local file system.
2. Install Oracle Database software on an ACFS file system.
3. Create several RAC One Node databases.
Which of the seven requirements are met by your plan?

Answer options

Correct answer: E

Explanation

The correct answer is E because installing Oracle Grid Infrastructure on a local file system allows for the application of interim patches, PSUs, and patchsets without downtime, as well as the ability to upgrade the Grid Infrastructure. However, the plan does not support the upgrade of databases or the application of database patchsets, which is why options that include those tasks are incorrect.