NetApp Certified Implementation Engineer – NVMe — Question 14
You are preparing to physically install a new AFF A400 cluster into a customer’s racks. All equipment has been delivered to the customer’s site.
Which three tools do you need to complete this installation? (Choose three.)
Answer options
- A. additional network cables
- B. Phillips #2 screwdriver
- C. laptop computer
- D. slide rail kit
- E. cable management tray
Correct answer: A, B, C
Explanation
The correct tools for the installation of the AFF A400 cluster include additional network cables for connectivity, a Phillips #2 screwdriver for securing components, and a laptop computer for configuration and management. The slide rail kit and cable management tray are not essential for the physical installation process.