Certified in Risk and Information Systems Control (CRISC) — Question 559
Which of the following is the result of a realized risk scenario?
Answer options
- A. Threat event
- B. Technical event
- C. Loss event
- D. Vulnerability event
Correct answer: C
Explanation
A realized risk scenario leads to a loss event, which indicates that the risk has actually caused harm or damage. The other options, such as threat, technical, and vulnerability events, are all potential precursors or contexts for risks but do not represent the actual realization of risk.