IBM FileNet Content Manager V5.5.3 — Question 25
Which statement is true regarding scheduling a reclamation process without impacting client backup in IBM Spectrum Protect?
Answer options
- A. Reclamation should be allowed to happen only by the automatic threshold.
- B. Reclamation should be scheduled to start after client backups finish utilizing a duration that ends before client backups start.
- C. Reclamation is only scheduled through an administrative script.
- D. Reclamation can only be scheduled through the Operations Center.
Correct answer: A
Explanation
The correct answer is A because allowing reclamation to occur solely based on the automatic threshold ensures that it does not interfere with ongoing client backups. Option B is incorrect as it suggests a specific timing that could still overlap with backups, while options C and D incorrectly limit the methods of scheduling reclamation.