IBM Tivoli Monitoring V6.3 Implementation — Question 71

A company wants to trigger a PM based on a characteristic type meter.
How can this be accomplished?

Answer options

Correct answer: B

Explanation

The correct answer is B because creating a condition monitoring point allows for the specification of limits that, when reached, can trigger the PM. Options A, C, and D do not directly facilitate the triggering of a PM based on the specific meter characteristic as effectively as option B does.