IBM MQ v9.2 System Administration — Question 66
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?
Answer options
- A. Meter Limit
- B. Warning Limit
- C. Measurement Limit
- D. Action Limit
Correct answer: D
Explanation
The correct answer is D, Action Limit, as it defines the specific threshold that, when exceeded, triggers the condition monitoring action. The other options, while related to limits, do not specifically indicate the point at which monitoring is activated.