IBM MQ v9.2 System Administration — Question 45

In the Master PM application, which two meter-based fields can be updated on associated Preventive Maintenance records? (Choose two.)

Answer options

Correct answer: B, E

Explanation

The correct answers are B and E because the Current Meter Reading and Frequency fields are specifically designed to be updated based on meter readings in Preventive Maintenance records. The other options, such as Estimation Type, Generate WO Ahead By, and Meter Type, do not pertain to meter-based updates in this context.