NSE 7 – SD-WAN 7.2 — Question 33
The SD-WAN overlay template helps to prepare SD-WAN deployments. To complete the tasks performed by the SD-WAN overlay template, the administrator must perform some post-run tasks.
What are three mandatory post-run tasks that must be performed? (Choose three.)
Answer options
- A. Assign an sdwan_id metadata variable to each device (branch and hub).
- B. Assign a branch_id metadata variable to each branch device.
- C. Create policy packages for branch devices.
- D. Configure SD-WAN rules.
- E. Configure routing through overlay tunnels created by the SD-WAN overlay template.
Correct answer: B, C, D
Explanation
The correct answers are B, C, and D because these tasks are essential for the proper configuration and operation of the SD-WAN deployment. Option A is incorrect as assigning an sdwan_id is not mandatory for each device, and option E, while important, is not categorized as a mandatory post-run task in this context.