EMC Proven Professional – Elastic Cloud Storage Solutions Expert — Question 8
What is the recommended way to power up VxRail G Series node?
Answer options
- A. Wait at least 30 seconds between powering up each node.
- B. Power up nodes in the following sequence: one, two, three, four.
- C. Use the BMC interface to power cycle each node
- D. Ensure System Health indicator blinks amber for 10 minutes after power on.
Correct answer: B
Explanation
The correct answer is B because powering up the nodes in the specified order ensures proper functionality and stability of the system. Option A is incorrect as the timing between powering up nodes isn't the recommended approach. Option C, while using the BMC interface is useful, does not specify the correct power-up order. Option D relates to the health check after power on but is not part of the recommended power-up procedure.