Dell EMC Specialist – Implementation Engineer, ECS — Question 5
How many cables are required to install a 4 node VxRail Model G410 cluster with 1 GbE into a rack?
Answer options
- A. 4 CAT6 and 16 Twinax network cables
- B. 4 CAT6 and 32 SFP+ connectors, and 16 fiber cables
- C. 4 CAT6 and 8 Twinax network cables
- D. 20 CAT6 network cables
Correct answer: D
Explanation
The correct answer is D, as a 4 node VxRail cluster typically requires 20 CAT6 cables for proper connectivity. The other options provide incorrect combinations of cables that do not meet the requirements for a 4 node setup.