Dell EMC Specialist – Implementation Engineer, ECS — Question 32
After finishing the rack and stack of a VxRail Model G410 cluster, in which sequence should the nodes be powered on?
Answer options
- A. All four at the same time
- B. Any order possible
- C. Forward order (1 - 4)
- D. Reverse order (4 - 1)
Correct answer: B
Explanation
The correct answer is B, as the nodes can be powered on in any sequence without affecting the overall functionality of the cluster. Options A, C, and D imply a specific order which is not necessary for proper operation in this scenario.