Dell EMC Specialist – Systems Administrator, PowerStore — Question 15

A company has an existing 8-node F800 Isilon cluster with two Z9100 Dell Ethernet back-end switches running on OneFS 8.2.0. The company is planning to add 72 A200 nodes into the cluster. What is the minimum number of additional switches required to support the configuration?

Answer options

Correct answer: D

Explanation

The correct answer is D because adding 72 A200 nodes requires additional network capacity that can only be met with more switches. Options A, B, and C do not provide enough connectivity to support the increased number of nodes effectively.