Dell EMC Associate – Information Storage and Management v5 — Question 40
What is the result of increasing the number of FC switches in a full mesh topology?
Answer options
- A. Reduces available node ports for ISL connectivity
- B. Reduces number of storage and compute ports for node connectivity
- C. Reduces switch ports available for node connectivity
- D. Reduces switch ports available bandwidth for node connectivity
Correct answer: C
Explanation
Increasing the number of FC switches in a full mesh topology can lead to a decrease in the number of switch ports available for node connectivity due to the complexity of managing numerous connections. The other options either misinterpret the impact on node ports or incorrectly state the effects on bandwidth and storage ports.