CompTIA Network+ (N10-007) — Question 68

A network administrator is going to be performing a major upgrade to the network. Which of the following should the administrator use in case of a failure?

Answer options

Correct answer: C

Explanation

The correct answer is C, the rollback plan, as it specifically outlines the steps to revert the network to its previous state in case the upgrade encounters problems. The baseline report (A) provides a reference point for performance but does not address failure recovery, while the vulnerability report (B) identifies security risks but is not related to upgrade failures. The business continuity plan (D) focuses on maintaining operations during disruptions but does not provide specific rollback procedures for upgrades.