CompTIA Network+ (N10-007) — Question 586
The management team has instituted a 48-hour RTO as part of the disaster recovery plan. Which of the following procedures would meet the policy's requirements?
Answer options
- A. Recover all systems to a loss of 48 hours of data.
- B. Limit the network downtime to a maximum of 48 hours per year.
- C. Recover all systems within 48 hours.
- D. Require 48 hours of system backup maintenance.
Correct answer: C
Explanation
Option C is correct because it directly aligns with the 48-hour RTO by ensuring that all systems are operational within that time frame. Option A is incorrect as recovering data loss does not guarantee system recovery within the specified RTO. Option B addresses network downtime rather than overall system recovery, making it irrelevant. Option D pertains to backup maintenance, which does not ensure the recovery of systems within the required timeframe.