CompTIA CASP+ (CAS-004) — Question 121
A security consultant needs to protect a network of electrical relays that are used for monitoring and controlling the energy used in a manufacturing facility.
Which of the following systems should the consultant review before making a recommendation?
Answer options
- A. CAN
- B. ASIC
- C. FPGA
- D. SCADA
Correct answer: D
Explanation
The correct answer is D, SCADA, as it is specifically designed for monitoring and controlling industrial processes, including electrical relays. Options A (CAN), B (ASIC), and C (FPGA) are hardware technologies that do not directly relate to the specific needs of managing and securing a network of electrical relays in a SCADA environment.