CompTIA A+ Core 1 (220-1101) — Question 563

A technician is replacing the RAM on an entry-level server with hot-swappable components. Which of the following should the technician do NEXT?

Answer options

Correct answer: C

Explanation

The correct answer is C because powering down the server entirely ensures that no data is lost and that the components can be safely replaced. Option A is incorrect as the temperature does not negate the need for powering down. Option B is wrong because replacing RAM while the server is running can lead to system instability. Option D is also incorrect because verifying OS support should be done prior to any action, not as the next step.