Implementing Cisco Application Centric Infrastructure (DCACI) — Question 282

An engineer configures port-12 on Leaf-101 and Leaf-102 to connect to a new server. SVR-12. The new server will belong to EPG-12 and use encap VLAN-1212. The engineer configured port-12 as a VPC member port and statically bound the VPC member port to EPG-12. Which additional step must the engineer take to configure connectivity?

Answer options

Correct answer: D

Explanation

The correct answer is D because associating a domain with EPG-12 that corresponds to VLAN-1212 is necessary for proper connectivity. Options A, B, and C do not address the requirement of linking the EPG with the appropriate domain for VLAN-1212, which is essential for the server's network configuration.