Implementing Cisco Application Centric Infrastructure (DCACI) — Question 230

A network engineer must integrate VMware vCenter cluster with Cisco ACI. The requirement is for the management traffic of the hypervisors and VM controllers to use the virtual switch associated with the Cisco Application Policy. The EPG called "Vmware-MGMT" with VLAN 300 has been created for this purpose. Which set of steps must be taken to complete the configuration?

Answer options

Correct answer: A

Explanation

The correct answer is A because it specifies the necessary steps to add VLAN 300 to the VLAN pool and properly attach the VMM domain to the target EPG with the required parameters. Options B and C do not include the necessary static allocation and configuration details needed for the EPG, while option D incorrectly focuses on static binding without addressing the VLAN pool configuration.