Implementing Cisco Application Centric Infrastructure (DCACI) — Question 230
A network engineer must integrate VMware vCenter cluster with Cisco ACI. The requirement is for the management traffic of the hypervisors and VM controllers to use the virtual switch associated with the Cisco Application Policy. The EPG called "Vmware-MGMT" with VLAN 300 has been created for this purpose. Which set of steps must be taken to complete the configuration?
Answer options
- A. • Add VLAN 300 with static allocation to the VLAN POOL that is used for VMM integration. • Attach the VMM domain to the target EPG with resolution preprovision, mode static, untagged access VLAN, and Port-Encap 300.
- B. • Associate the target EPG with the VMM domain with default settings. • Enable Infrastructure VLAN on AAEP used toward VMware hypervisors.
- C. • Enable Infrastructure VLAN on AAEP used toward VMware hypervisors. • Associate the target EPG with the VMM domain with default settings.
- D. • Enable Infrastructure VLAN on AAEP used toward VMware hypervisors. • Create a static binding in the target EPG toward VMware hypervisors with VLAN 300, untagged access VLAN, and Untagged 802.1P mode.
Correct answer: A
Explanation
The correct answer is A because it specifies the necessary steps to add VLAN 300 to the VLAN pool and properly attach the VMM domain to the target EPG with the required parameters. Options B and C do not include the necessary static allocation and configuration details needed for the EPG, while option D incorrectly focuses on static binding without addressing the VLAN pool configuration.