An engineer must integrate a Cisco ACI fabric with VMware and discover an ESXi host using LLDP. Two EPGs have been created and associated with the VMM domain. The engineer must configure the ACI such that contracts are pushed to the ACI leaf switches when the VM is mapped to EPG and the contracts are removed when LLDP is disabled. Which configuration must be selected to meet these requirements?

Answer options

Correct answer: B

Explanation

The correct answer is B, as selecting 'Resolution immediacy: On-Demand' allows for contracts to be applied when the VM is associated with the EPG and removed when LLDP is disabled. The other options do not fulfill the requirement of dynamically managing contract deployment based on the state of LLDP.