Designing Cisco Enterprise Wireless Networks (ENWLSD) — Question 66

A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)

Answer options

Correct answer: A, B, F

Explanation

The correct answer includes options A, B, and F because a battery pack is essential for powering the access points during the survey, a drawing helps in planning placements effectively, and built-in antennas simplify the setup process. Options C, D, and E are not recommended; conducting a DoS attack is unethical, and while directional or external antennas can be useful, they are not necessary for a basic site survey.