Designing Cisco Enterprise Wireless Networks (ENWLSD) — Question 134
An engineer is designing a point-to-multipoint mesh network. Which two AP configurations must be completed for a site survey? (Choose two.)
Answer options
- A. MAP hostnames
- B. Rx power
- C. mesh on 2.4 GHz band
- D. bridge group name
- E. Tx power
Correct answer: B, E
Explanation
The correct answers are B and E because receiving (Rx) power and transmitting (Tx) power are essential for assessing coverage and connectivity in a site survey. Options A, C, and D are not directly related to the fundamental power settings required for evaluating a mesh network's performance.