Designing Cisco Enterprise Wireless Networks (ENWLSD) — Question 130
An engineer working for an enterprise deployed multiple Cisco WLCs. A controller that sits in the R&D division is connected through a firewall and is part of the same mobility group. The engineer must ensure that the mobility tunneling is available through the firewall and test it as R&D engineers roam the production floor within their department. How is this requirement met?
Answer options
- A. mping on UDP port 16666 and eping on Protocol 96 between management ports
- B. mping on UDP port 16666 and eping on Protocol 97 between management ports
- C. mping on UDP port 16667 and eping on Protocol 97 between management ports
- D. mping on UDP port 16667 and eping on Protocol 96 between management ports
Correct answer: B
Explanation
The correct answer is B because it specifies the correct UDP port and protocol needed for mobility tunneling between the management ports of the Cisco WLCs. Options A, C, and D use incorrect combinations of UDP ports or protocols that do not meet the requirements for mobility tunneling in this scenario.