Implementing Cisco SD-WAN Solutions (ENSDWI) — Question 449
What is the next step when the WAN Edge device boots up and resolves the domain in the ZTP process for WAN Edge deployment?
Answer options
- A. The WAN Edge device establishes secure connections with the vManage and vSmart and downloads the configuration using NETCONF.
- B. The WAN Edge router authenticates to the vBond orchestrator with the chassis serial number and root certificate.
- C. The WAN Edge device establishes secure control plane connections with the controllers and secure data plane connections in the SD-WAN overlay network.
- D. The WAN Edge device learns the vBond and organization name from the configuration and initiates a secure control connection to the vBond orchestrator.
Correct answer: B
Explanation
The correct answer is B because the WAN Edge router must authenticate itself to the vBond orchestrator using its chassis serial number and root certificate to establish trust. The other options describe steps that occur later in the process but are not the immediate next step after resolving the domain.