Atlassian Certified in Managing Jira Projects for Cloud (ACP-100) — Question 1
You have planned, tested, and performed a Jira upgrade.
The upgrade appeared to be a success; however, after several hours of use, your users are reporting significant problems and you decide to roll back.
Which two effects do you expect to see after the rollback? (Choose two.)
Answer options
- A. Emails will automatically be sent out to tell people about the rollback.
- B. New issues entered between upgrade and rollback will be lost.
- C. The color scheme will be set back to default to indicate there was a rollback.
- D. Jira will go back to the same schemes as before the upgrade.
- E. Jira will need to be reconnected to other systems it was integrated with.
Correct answer: B, D
Explanation
Option B is correct because any new issues created after the upgrade and before the rollback will not be retained, leading to their loss. Option D is also correct as Jira will revert to the configurations that were set before the upgrade. The other options are incorrect because the rollback process does not automatically notify users, change the color scheme, or require reconnection to systems.